स्वागत, Monday , Apr , 28 , 2025 | 18:01 IST
स्वागत, Monday , Apr , 28 , 2025 | 18:01 IST
निविदा संख्या | निविदा विवरण | तिथि व निविदा खोलने के समय | निविदा डाउनलोड | अधिक |
---|---|---|---|---|
15/657/19-20/ESD/CC/Maint |
Earth work in excavation, shifting and leveling the land back side of the long pond beside water treatment plant in CSIR-CMERI Institute, Durgapur 09 Click here for the Corrigendum dated 17/01/2020 |
23/01/2020 - 15:00 | विवरण | |
PUR/538/EEG/AP/E/2019-20 |
SUPPLY AND INSTALLATION OF BENCH TOP DISSOLVED OXYGEN METER |
27/01/2020 - 15:30 | विवरण | |
PUR/539/COE-FMPA/AM/E/2019-20 |
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF PORTABLE VIBRATION ANALYSER |
27/01/2020 - 15:30 | विवरण | |
PUR/357/COE-EPH/MP/E/2019-20 |
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF REACTOR TANK, HEAT EXCHANGER, HIGH VACUUM PRODUCING SYSTEM AND STORAGE TANK |
29/01/2020 - 15:30 | विवरण | |
PUR/509/SET/BB/E/2019-20/RET |
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF ELECTROCHEMICAL SET UP POTENTIOSTAT GALVANOSTAT FOR ELECTROCHEMICAL AND SENSING STUDY |
29/01/2020 - 15:30 | विवरण | |
PUR/449/SET/BB/E/2019-20 |
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF REGENERATIVE DYNAMIC BATTERY EMULATOR SYSTEM |
29/01/2020 - 15:30 | विवरण | |
PUR/406/AMF/BB/E/2019-20 |
SUPPLY TESTING INSTALLATION AND COMMISSIONING OF HIGH TEMPERATURE VACUUM SINTERING FURNACE |
24/01/2020 - 15:30 | विवरण | |
13/Horti/01/2020/Maint/ESD |
Trimming of 120 nos. of Tree branches Click here for Corrigendum dated 10/1/2020 |
13/01/2020 - 15:00 | विवरण | |
PUR/390/SET/SB/E/2019-20 |
Supply of Programmable controller with drive for high precision control of XYZ air bearing stage |
17/01/2020 - 15:30 |
![]() |
विवरण |
13/638/2018-19/CI/Proj/ESD |
Supply, fitting and fixing of Aluminium partition, sliding door in WET Lab, a part of Surface Engineering & Tribology Group at CMERI, Durgapur 09 |
15/01/2020 - 15:00 | विवरण |