स्वागत, Sunday , Apr , 27 , 2025 | 03:42 IST
स्वागत, Sunday , Apr , 27 , 2025 | 03:42 IST
निविदा संख्या | निविदा विवरण | तिथि व निविदा खोलने के समय | निविदा डाउनलोड | अधिक |
---|---|---|---|---|
2018_CSIR_12675_1 |
Replacement of False Ceiling and Electrification work for arrangement of LED Lights suitable for Gypsum, POP false ceiling at Directors Office of CSIR-CMERI, Durgapur |
18/07/2018 - 15:00 |
![]() |
विवरण |
PUR/421/NETDG/04/2017-18/RET |
Horizontal Knife Edge Valves having 600mm diameter along with pneumatic cylinders, Pneumatic Plunger with 2 meter stroke length along with valves and pneumatic control panel accessories |
19/07/2018 - 15:00 |
![]() |
विवरण |
PUR/134/NETDG/04/2018-19 |
Electrical & Electronics Instruments for 1 TPD HW Set Up |
19/07/2018 - 15:30 |
![]() |
विवरण |
PUR/133/SET/10/2018-19 |
Capsaicin Powder USP > 95% |
19/07/2018 - 15:30 |
![]() |
विवरण |
PUR/111/NETDG/11/2018-19 |
Supply, Installation, Testing And Commissioning Of Waste Plastic Pyrolysis Plant to process 50 kg plastic waste per batch and convert it into crude oil |
19/07/2018 - 15:30 |
![]() |
विवरण |
PUR/113/SET/05/2018-19 |
Supply, Installation, Testing And Commissioning Of Two [2] Channel Electrochemical Workstation |
19/07/2018 - 15:30 |
![]() |
विवरण |
PUR/112/CRTDH/06/2018-19 |
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DEBINDING FURNACE |
19/07/2018 - 15:30 |
![]() |
विवरण |
2018_CSIR_11942_1 |
Replacement of False Ceiling and Electrification work for arrangement of LED Lights suitable for Gypsum, POP false ceiling at Directors Office of CSIR-CMERI, Durgapur |
27/06/2018 - 15:00 |
![]() |
विवरण |
2018_CSIR_11954_1 |
Construction of RCC cover of drain in between Condition Monitoring Lab and Academic Building at CMERI, Durgapur |
28/06/2018 - 15:00 |
![]() |
विवरण |
2018_CSIR_11946_1 |
Fixing of Colour coated GI profile sheet beside Condition Monitoring Lab to Academic Building and in L shape up to Boundary wall at CSIR-CMERI, Durgapur |
28/06/2018 - 15:00 |
![]() |
विवरण |