custom_preset_views_email_filter

Welcome, Friday , Apr , 25 , 2025 | 22:23 IST

CSIR HQ Tenders Career Contact Us Expression of Interest International Program

Languages

Languages

Home

CSIR - CMERI

CSIR - Central Mechanical Engineering Research Institute, Ministry of Science &Technology, Govt. of India सीएसआईआर - केंद्रीय यांत्रिक अभियांत्रिकी अनुसंधान संस्थान, विज्ञान और प्रौद्योगिकी मंत्रालय, भारत सरकार সিএসআইআর - সেন্ট্রাল মেকানিক্যাল ইঞ্জিনিয়ারিং রিসার্চ ইনস্টিটিউট, বিজ্ঞান ও প্রযুক্তি মন্ত্রণালয়, ভারত সরকার
Mobile nav

Error message

Notice: Undefined index: uid in views_handler_field->get_value() (line 375 of /home/demosite/public_html/cmeri/sites/all/modules/contrib/views/handlers/views_handler_field.inc).
Last updated : 24 May, 2019

Bathymetric and Hydrographic survey over 20km stretch of river Rupnarayan, at Purba Medinipur Dist.

To map the river bed profile for 20 km stretch and determining Width of water flow, Maximum depth of water, Mean depth of water, Area of water flow, Mean velocity of water, Average Discharge of water, Salinity, Temperature, Turbidity at four sections for continuous four days per season for three different seasons.

Project Number:
TSP-1172
Project Type:
Project Date:
12/03/2019 to 11/03/2020
Sponsoring Agency:
West Bengal Drinking Water Sector Improvement Project; Govt of West Bengal
Deliverables:
  1. Conducting bathymetry surveys over 20km stretch of the river in a grid manner of size of 50m and determining river bed profile.
  2. Measuring continuous Tide Levels of river at four sections for continuous four days at a stretch per season, in three different seasons
  3. Conducting Hydrographic Survey across river using Acoustic Doppler Current Profiler at four sections for four days at a stretch per season, for three different seasons and determining:
    • Width of water flow
    • Maximum depth of water
    • Mean depth of water
    • Area of water flow
    • Mean velocity of water
    • Average Discharge of water
  4. Determining Salinity, Temperature, Turbidity at sections A, B, C, D for four days per season for three different seasons.
  5. Testing of Water Samples, Bed samples and Suspended sediment samples.