Welcome, Friday , May , 16 , 2025 | 06:06 IST
Welcome, Friday , May , 16 , 2025 | 06:06 IST
Project Master
Delete link:
Edit link: |
Project Master
Delete link:
Edit link: |
Project Master
Design and development of Building Debris feeding system for the Crusher. Delete link:
Edit link: |
Project Master
Extension of CCTV based campus surveillance system with mob detection algorithm. Delete link:
Edit link: |
Project Master
Establishing heat treatment and coating facility Delete link:
Edit link: |
Project Master
Design and Installation of Solar Trees of total capacity 17 kWp at Office and Colony of CSIR-CMERI. Delete link:
Edit link: |
Project Master
Design of retrofittable CCTV surveillance module for Solar Lamp Post. Delete link:
Edit link: |
Project Master
Design and Development of Solar Artifacts Delete link:
Edit link: |
Project Master
Facility creation for experimental studies on a 30 kW micro gas turbine Delete link:
Edit link: |
Project Master
Development of shock tube facility for blastwave attenuation and mitigation studies Delete link:
Edit link: |