custom_preset_views_email_filter

Welcome, Thursday , May , 08 , 2025 | 08:28 IST

CSIR HQ Tenders Career Contact Us Expression of Interest International Program

Languages

Languages

Home

CSIR - CMERI

CSIR - Central Mechanical Engineering Research Institute, Ministry of Science &Technology, Govt. of India सीएसआईआर - केंद्रीय यांत्रिक अभियांत्रिकी अनुसंधान संस्थान, विज्ञान और प्रौद्योगिकी मंत्रालय, भारत सरकार সিএসআইআর - সেন্ট্রাল মেকানিক্যাল ইঞ্জিনিয়ারিং রিসার্চ ইনস্টিটিউট, বিজ্ঞান ও প্রযুক্তি মন্ত্রণালয়, ভারত সরকার
Mobile nav

Semantic Views demo

Project Master

Design & development of a prototype of One-row Cotton picking head

Delete link:
Edit link:
Project Master

To develop a generic algorithm for image processing of cotton ball in order to develop a computerized vision based picking system.

To develop vision based lab demonstrable picking system using suction

Delete link:
Edit link:
Project Master

To design & develop a semi- continuous type biodiesel plant suitable for rural sector, testing of biodiesel plant and testing of biodiesel produced from the plant

Delete link:
Edit link:
Project Master

Design and development of low cost floating drum type biogas plant suitable for production of biogas from deoiled cake of Jatropha, optimization of production parameters, quality analysis of biogas, power generation from biogas.

Delete link:
Edit link:
Project Master

To develop infrastructure facility for supporting in house requirement and potential business development. Gas Chromatography will help to analyze the quality of raw vegetable oil, biodiesel, bioethanol and biogas.

Delete link:
Edit link:
Project Master

Study of existing Sonalika 35 hp tractor, modification of the engine hardware to suit for running on B100, endurance test of Sonalika DI – 35 on diesel and B100 (both on test bed & field), study of the engine after the test, incorporation of any other hardware changes, if required and demonstration of B100 fuelled tractor.

Delete link:
Edit link:
Project Master

To design Indigenous Fuel Injection Pump, Imparting training on Rapid Prototyping at Cluster and Development of Training Facility for young engineers (Creation of Engine test facility)

Delete link:
Edit link:
Project Master

To develop modified design of less expensive machineries for various sub activity of Bamboo stick production, to enhance the productivity, to minimize the wastage of raw materials, to ensure improved ergonomics of working processes and tools, better working conditions.

Delete link:
Edit link:
Project Master

Design and development of 1.5 m3/day capacity roof top biogas plant based on solid state fermentation using kitchen waste, optimization of production parameters, quality analysis of biogas and economic evaluation

Delete link:
Edit link:
Project Master

Design, development and commissioning of a 25 m3/ day capacity (minimum) biogas plant based on kitchen waste

Delete link:
Edit link:

Pages