S.No | Last Date/Time of Submission | Last Date/Time of Sales/Download of Documents | Name Of Work | Tender Notice | Tender Status |
---|---|---|---|---|---|
901 | 06/11/2020 - 15:00 | 04/11/2020 - 17:45 | Providing Water Supply Improvement Scheme to Expanded Coimbatore Corporation including Newly Merged Areas with River Bhavani as source Pillur 3 Package 1A1 | 12 F Pillur III Package 1A1 SDO T1 CE CBE 2020 Dt 15 9 2020 | Status |
902 | 23/09/2020 - 15:00 | 21/09/2020 - 17:45 | CWSS to Ennegollu and 122 other habitations in Veppanapalli union of Krishnagiri District from the infiltration well as sources in Thenpennaiyar river near Thavalam Village. Execution period – 12 months, Trial run period – 6 months and maintenance of the scheme – 12 months. – 2nd call – Short term | IFB No. 09/CWSS to Ennegollu - 2nd call / DO / CE / VLR / 2020 / Dated: 07.09.2020 | Status |
903 | 15/09/2020 - 15:00 | 14/09/2020 - 15:30 | TENDER SCHEDULE FOR OUTSOURCING MANPOWER UTILIZED FOR WATER SAMPLE COLLECTION, TESTING, IMIS DATA ENTRY AND NABL ACTIVITIES –PURELY SCIENTIFIC WORK AT STATE LEVEL WATER TESTING LABORATORY , TWAD BOARD, CHENNAI. | IFB.No.02/F.001-outsourcing/CWA/TWAD/HO/2020dt.01.09.2020 | Status |
904 | 29/10/2020 - 15:00 | 27/10/2020 - 17:45 | Providing CWSS to Thittakudi, Pennadam, Mangalampettai, Vadalur, Kurinjipadi and Gangaikondan, Town Panchayats and 625 rural habitations in Mangalore, Nallur and Virudhachalam, Unions of Cuddalore District with NLC Mine Water as source. Period of Completion – 18 Months, Trial run – 6 Months and paid maintenance of the scheme – 60 Months – Package I – 2nd call | 08 / NLC - CWSS Pkg I - 2nd call / DO / CE / VLR / 2020 / Dated: 28.08.2020 | Status |
905 | 11/09/2020 - 15:00 | 09/09/2020 - 17:30 | Empanelment of Third party Inspection Agencies under JJM | EoI . No. 31720/F.TPI/2020/dt. 26.08.2020 | Status |
906 | 12/08/2020 - 15:00 | 11/08/2020 - 17:45 | Balance works for Erection of Pumpset, Supply Delivery of Starter and allied works in All Tapping sumps under CWSS to 293 Rural Habitations in Musiri, T.Pettai, Thuraiyur and Uppiliyapuram unions of Tiruchirappalli District - (PACKAGE-T19) Period of Completion 6 Months-trial run-3 months | Short Term Chit Tender Notice No. 05 /F.Tender/JDO/2020/Dt:03.08.2020. | Status |
907 | 18/08/2020 - 15:00 | 17/08/2020 - 17:45 | Outsourcing for maintenance of Block level water quality testing laboratory at Palacode in Dharmapuri District including maintenance of lab, supply of consumables, collection of water samples,analysis of samples and preparation and submission of reports and Data entry in IMIS then and there , testing works completed from every month of completing the works | 03/F.TENDER /PD/JDO/2020 dt- 29.07.2020 | Status |
908 | 18/08/2020 - 15:00 | 17/08/2020 - 17:45 | Outsourcing for maintenance of sub district water quality testing laboratory at Morappur in Dharmapuri District including maintenance of lab, supply of consumables, collection of water samples,analysis of samples and preparation and submission of reports and Data entry in IMIS then and there , testing works completed from every month of completing the works | 03/F.TENDER /PD/JDO/2020 dt- 29.07.2020 | Status |
909 | 18/08/2020 - 15:00 | 17/08/2020 - 17:45 | Outsourcing for maintenance of sub district water quality testing laboratory at Hosur in Krishnagiri District including maintenance of lab, supply of consumables, collection of water samples,analysis of samples and preparation and submission of reports and Data entry in IMIS then and there , testing works completed from every month of completing the works | 03/F.TENDER /PD/JDO/2020 dt- 29.07.2020 | Status |
910 | 18/08/2020 - 15:00 | 17/08/2020 - 17:45 | Outsourcing for maintenance of sub district water quality testing laboratory at MATHUR in Krishnagiri District including maintenance of lab, supply of consumables, collection of water samples,analysis of samples and preparation and submission of reports and Data entry in IMIS then and there , testing works completed from every month of completing the works . | 03/F.TENDER /PD/JDO/2020 dt- 29.07.2020 | Status |
911 | 21/08/2020 - 15:00 | 20/08/2020 - 17:45 | THE WORK OF ASSEMBLING OF 1695 Nos. of FULL FIELD KITS & SUPPLY OF 90000 Nos. of H2S vials IN STATE LEVEL WATER TESTING LABORATORY IN TWAD BOARD, CHEPAUK, CHENNAI-5, SUPPLY AND DELIVERY OF CHEMICALS AND OTHER ITEMS MENTIONED IN THE ANNEXURE AS PER STANDARD SPECIFICATIONS TO STATE LEVEL WATER TESTING LABORATORY, TWAD BOARD, CHENNAI, INCLUDING COST OF CHEMICALS, LOADING, UNLOADING, PACKING & STACKING CHARGES AT TWAD BOARD, TRANSIT INSURANCE CHARGES, CHARGES FOR FILLING OF REAGENTS AND PACKING OF FINAL KIT AT TWAD STATE LEVEL LAB ETC., TO COMPLETE AND AS DIRECTED BY THE CHIEF WATER ANALYST OF TWAD BOARD. | IFB. No. F. 001 /F. Assembling of Kit/ CWA /TWAD /2020/Dated: 04.08.2020 | Status |
912 | 21/08/2020 - 15:00 | 19/08/2020 - 17:45 | Surveying and levelling by Total Station Method and Trial pit excavation works through outsourcing for the Transmission Main Feeder Mains and Branch Pumping Mains to Formulate a New CWSS to Ottanchatram Municipality and wayside habitations of Dindigul and Tiruppur Districts taking Thirumoorthi Dam Pickup weir as Source including fixing Bench marks, Preparing alignment plan, LS plan, Ceritified L.F. Book and handing over of 5 sets of Drawings, L.F. books and other connected records along with soft copies in prescribed format etc complete | IFB No 2 F Tender Notice DO PF Dn Mdu 2020 Dt 3 8 2020 | Status |
913 | 21/08/2020 - 15:00 | 19/08/2020 - 17:45 | Surveying and levelling by Total Station Method and Trial pit excavation works through outsourcing for the Transmission Main Feeder Mains and Branch Pumping Mains to Formulate a New CWSS to 391 Rural Habitations in Kallikudi, Thirumangalam Usilampatti and Chellampatti Unions of Madurai District taking Vaigai Dam Pickup weir as Source including fixing Bench marks, Preparing alignment plan LS plan Ceritified L F Book and handing over of 5 sets of Drawings L F books and other connected records along with soft copies in prescribed format etc complete | IFB No 2 F Tender Notice DO PF Dn Mdu 2020 Dt 03 08 2020 | Status |
914 | 19/08/2020 - 15:00 | 18/08/2020 - 17:45 | Engagement of WASH consultant in State Project Management Unit, JJM, Chennai with UNICEF assistance | RFP No.15720/F.UNICEF/JJM-1/2020/dt.05.08.2020 | Status |
915 | 12/08/2020 - 15:00 | 11/08/2020 - 17:45 | -Sl.No.1 – Foot Bridge From Pier 35 – 38 FROM Head Works to Devanur BS And Ayyampalayam TS to Kodunthurai SP (T-3) / Sl.No.2 - Construction Of 0.10 LL OHT & Hydro Testing (T-11)/ Sl.No.3 - Stand Posts At Peruganoor and Soorampatti (T-12)/ Sl.No.4 - Sirunavalur GS Pumproom, Erection of Pumpset at Uppiliyapuram and Hydro Testing (T-13)/ Sl.No.5 - Branch Pumping Main From Kottapalayam TS to Thalugai GS & Hydro Testing (T-14) Sl.No.6- Pumproom at Devanur BS, Devanur GS, Valasiramani GS & Branch Pumping Main in 250mm DI K7 Pipes from the Karukudi to Marugur and Hydro Testing (T-15)/ Sl.No.7 - Pumproom and OHTs In Thuraiyur Union and Hydro Testing (T-16)/ Sl.No.8 Erection Of Pumpset and allied works In Thuraiyur Union, and Hydro Testing (T-17) | IFB .02 / F.CWSS to 293-phase-II/ DO / DB / TPC / TRY / 2020/ Dt:28.07.2020 | Status |
916 | 12/08/2020 - 15:00 | 11/08/2020 - 17:45 | Balance works of CWSS to 293 Rural Habitations in Musiri, T.Pettai, Thuraiyur and Uppiliyapuram unions in Tiruchirappalli District –period of completion 6 months of following the Reaches of -Sl.No.1 – Pumping Main from LS 0 M TO 460 M & Erection of Pump set at HW (T-2) / Sl.No.2 -Foot Bridge from Pier 38 – 40 (T-4)/ Sl.No.3 -Foot Bridge from Pier 40 – 47 (T-5)/ Sl.No.4 -450 mm DI K7 pipes from valavanthi BS in 450 mm DI K7 pipes at LS 460 M TO 14464 M (T-6)/ Sl.No.5 - Pumping Main from HW at LS 14464 m to valavanthi BS and Erection of Pump set at Devanur BS (T-7)/ Sl.No.6- Pumping Main in 400 mm DI K7 pipes From Valavanthi BS TO Devanur BS From LS 0 M to 6902 M (T-8)/ Sl.No.7 - Pumping Main in 400 mm DI K7 pipes from Valavanthi BS from LS 6902 m to Devanur BS (T-9)/ Sl.No.8 Feeder main from Ayyampalayam TS, Erection of Pumpset, and construction of Stand post and allied works (T-10) /Sl.No.9 Branch Pumping Main & Feeder Main From Valavanthi BS To Devanur BS, (T-18) | IFB .01 / F.CWSS to 293-phase-II/ DO / DB / TPC / TRY / 2020/ Dt:28.07.2020 | Status |
917 | 26/08/2020 - 15:00 | 24/08/2020 - 17:45 | Providing WSIS toThenkarai Town Panchayat in Theni District including maintenance for a period of 12 months (Period of completion – 12 months) | F. WSIS to Thenkarai T.P. /SDO I/ CW /2020 /Dt.20.07.2020 | Status |
918 | 28/08/2020 - 15:00 | 26/08/2020 - 17:45 | Providing WSIS toThenkarai Town Panchayat in Theni District including maintenance for a period of 12 months (Period of completion – 12 months) | F. WSIS to Thenkarai T.P. /SDO I/ CW /2020 /Dt.20.07.2020 | Status |
919 | 10/08/2020 - 15:00 | 07/08/2020 - 17:45 | Providing 1.15 MLD Sewage Transmission main from TNSCB HFA project area for 1920 tenements at Narimedu of Pudukkottai district under deposit work to the existing 10.62 mld STP of Pudukkottai Municipality at Maurpini Grass farm under deposit work including paid maintenance for one year(Period of completion 12 months | 03/ F. STM to TNSCB /2020/ SDO /dt.03.07.2020 | Status |
920 | 30/07/2020 - 15:00 | 28/07/2020 - 17:45 | Purchasing Jetting cum suction machine/Kit for providing Under Ground Sewerage Scheme to Tiruchendur Town Panchayat in Thoothukudi District. | 01/F.Tender Notice/JDO/2020/dt.14.07.2020 | Status |
Sunday, 20 April 2025