Closed Tenders

S.No Last Date/Time of Submission Last Date/Time of Sales/Download of Documents Name Of Work Tender Notice Tender Status
1 19/03/2024 - 15:00 18/03/2024 - 17:45 Permanent Restoration of Damaged Components due to Michaung Cyclone 2023 for the following CWSS to Tambaram-Pallavaram, CWSS to Ozhalur and 6 other habitations, CWSS to Pudhupattinam and 18 other habitations, CWSS to Maraimalai Nagar Municipality in Chengalpattu District under Flexi Funds of Jal Jeevan Mission. 11 Status
2 15/02/2024 - 15:00 14/02/2024 - 17:45 Supply and Laying of Connecting Main and cable from infiltration Well No.4 to Sump and supply of starters at Thengal Head works under existing WSS to BHEL Complex in Ranipet District under Full Deposit work. (Period of Completion – 3 Months, Maintenance of the scheme (Free of Cost) – 2 months) 05 / F. WSS to BHEL Complex / JDO/RWS/RPT/ 2024 Dated: 31.01.2024 Status
3 07/02/2024 - 15:00 06/02/2024 - 17:45 Shifting the existing tapping point at Renault Nissan campus to the newly constructed SIPCOT sumpat SIPCOT Industrial Park, Oragadam as a deposit work under CWSS to Tambaram – Pallavaram in Chengalpattu District. 10 Status
4 07/02/2024 - 15:00 06/02/2024 - 17:45 Shifting the existing tapping point at Renault Nissan campus to the newly constructed SIPCOT sump at SIPCOT Industrial Park, Oragadam as a deposit work under CWSS to Tambaram – Pallavaram in Chengalpattu District. 10 Status
5 31/01/2024 - 15:00 29/01/2024 - 17:45 Replacement Of Damaged Pipeline During Road Widening By State Highways in Pumping Main From Chatrapatti Sump To Nenmeni Sump Under CWSS to 755 Rural Habitations In Sattur, Vembakottai, Sivakasi, Virudhunagar, Watrap (Part), Srivilliputhur (Part), And Aruppukottai (Part) Unions In Virudhunagar District 06 /F.Tender Notice/JDO/2024/Dt.18.01.2024 (IInd Call) Status
6 31/01/2024 - 15:00 29/01/2024 - 17:45 Replacement of Damaged pipeline during road widening by state highways in pumping main from Nenmeni Sump to Kundalakuthur OHT and Chatrapatti sump to Nenmeni sump under CWSS to 755 rural habitations in Sattur, Vembakottai, Sivakasi, Virudhunagar, Watrap (part), Srivilliputhur (part), and Aruppukottai (part) unions in Virudhunagar District 06 /F.Tender Notice/JDO/2024/Dt.18.01.2024 (IInd Call) Status
7 31/01/2024 - 15:00 29/01/2024 - 17:45 Replacement of damaged pipeline during road widening by state highways in Branch Main Between Kottur Sump To Kadambankulam Sump, Feeder Main From Mannarkottai Sump To Chinnayapuram, Branch Main Auvidayapuram Sump To Kottur, In Virudhunagar Union, Feeder Main From Kathalampatti Sump To Alampatti OHT and Nenmeni Sump To Kundalakuthur OHT In Sattur Union Under CWSS to 755 Rural Habitations In Sattur, Vembakottai, Sivakasi, Virudhunagar, Watrap (Part), Srivilliputhur (Part), And Aruppukottai (Part), Unions In Virudhunagar District. 06 /F.Tender Notice/JDO/2024/Dt.18.01.2024 (IInd Call). Status
8 31/01/2024 - 15:00 29/01/2024 - 17:45 Replacement of Damaged pipeline during road widening by state highways in branch main from kanjanaickenpatti sump to kurunthamadam sump and malaipatti sump under CWSS to 637 rural habitations in Aruppukottai, Kariapatti, Tiruchuli, Narikudi and Virudhunagar(part) union in Virudhunagar District. 6 Status
9 18/01/2024 - 15:00 12/01/2024 - 17:45 Replacement Of Damaged Pipeline During Road Widening By State Highways in Pumping Main From Chatrapatti Sump To Nenmeni Sump Under CWSS to 755 Rural Habitations In Sattur, Vembakottai, Sivakasi, Virudhunagar, Watrap (Part), Srivilliputhur (Part), And Aruppukottai (Part) Unions In Virudhunagar District. 6/F.Tender Notice/JDO/2024/Dt.06.01.2024 Status
10 18/01/2024 - 15:00 12/01/2024 - 17:45 Replacement of Damaged pipeline during road widening by state highways in pumping main from Nenmeni Sump to Kundalakuthur OHT and Chatrapatti sump to Nenmeni sump under CWSS to 755 rural habitations in Sattur, Vembakottai, Sivakasi, Virudhunagar, Watrap (part), Srivilliputhur (part), and Aruppukottai (part) unions in Virudhunagar District. 6/F.Tender Notice/JDO/2024/Dt.06.01.2024 Status
11 31/01/2024 - 15:00 29/01/2024 - 17:45 Replacement of Damaged pipeline during road widening by state highways in branch main from kanjanaickenpatti sump to kurunthamadam sump and malaipatti sump under CWSS to 637 rural habitations in Aruppukottai, Kariapatti, Tiruchuli, Narikudi and Virudhunagar(part) union in Virudhunagar District. 6/F.Tender Notice/JDO/2024/Dt.06.01.2024 Status
12 18/01/2024 - 15:00 12/01/2024 - 17:45 Replacement of damaged pipeline during road widening by state highways in Branch Main Between Kottur Sump To Kadambankulam Sump, Feeder Main From Mannarkottai Sump To Chinnayapuram, Branch Main Auvidayapuram Sump To Kottur, In Virudhunagar Union, Feeder Main From Kathalampatti Sump To Alampatti OHT and Nenmeni Sump To Kundalakuthur OHT In Sattur Union Under CWSS to 755 Rural Habitations In Sattur, Vembakottai, Sivakasi, Virudhunagar, Watrap (Part), Srivilliputhur (Part), And Aruppukottai (Part), Unions In Virudhunagar District. 6/F.Tender Notice/JDO/2024/Dt.06.01.2024 Status
13 18/01/2024 - 15:00 12/01/2024 - 17:45 Replacement of damaged pipeline during road widening by state highways in Branch Main Between Kottur Sump To Kadambankulam Sump, Feeder Main From Mannarkottai Sump To Chinnayapuram, Branch Main Auvidayapuram Sump To Kottur, In Virudhunagar Union, Feeder Main From Kathalampatti Sump To Alampatti OHT and Nenmeni Sump To Kundalakuthur OHT In Sattur Union Under CWSS to 755 Rural Habitations In Sattur, Vembakottai, Sivakasi, Virudhunagar, Watrap (Part), Srivilliputhur (Part), And Aruppukottai (Part), Unions In Virudhunagar District. 6 Status
14 18/01/2024 - 15:00 12/01/2024 - 17:45 Replacement Of Damaged Pipeline During Road Widening By State Highways in Pumping Main From Chatrapatti Sump To Nenmeni Sump Under CWSS to 755 Rural Habitations In Sattur, Vembakottai, Sivakasi, Virudhunagar, Watrap (Part), Srivilliputhur (Part), And Aruppukottai (Part) Unions In Virudhunagar District. 6 Status
15 18/01/2024 - 15:00 12/01/2024 - 17:45 Repalcement of Damaged pipeline during Road widening by State Highways in Various location under CWSS to 637 and CWSS to 755 rural habitations in Virudhunagar District 6 Status
16 21/12/2023 - 15:00 20/12/2023 - 17:45 Supply, delivery, laying, jointing and Testing of pipes and allied works pipelines damaged in Chinnarampatty (1 HAB), Thoranampathy (1 HAB) Panchayats of Kandhili Union, Dhamalerimuthur (1 HAB), Katteri(3 HAB), Elagiri (5 HAB), Chinnakallupalli (2 HAB), Chinnaveppampattu (5 HAB), Mandalavadi (10 HAB), Ponneri (6 HAB), Chettiappanur (3 HAB), Kalendra (3 HAB) Panchayats of Jolarpet Union, Kothakottai (2 HAB), Nimmiyampattu (3 HAB), Vellakuttai (3 HAB) Panchayats of Alangayam Union and Alangayam TP (1 HAB) under Vellore CWSS Package II in Thiruppathur District due to Pipelines damaged by other department. 03 Status
17 05/12/2023 - 17:45 05/12/2023 - 17:30 Shifting of Pipeline which are affected due to road widening in NH48 at Arapakkam 129/150KM and VC Mottur to Vannevidu near Walajah Government Hospital in NH4 in Vellore District under Vellore CWSS. 09 / F. Tender Notice / DB / 2023 Dated: 20.11.2023 Status
18 05/12/2023 - 17:45 05/12/2023 - 17:30 Shifting of water Supply PVC pipelines along/across NH48 in Kandaneri Jn Km.100/893 and Valandaram Jn Km.104/800 on both sides due to Construction of Underpass six lane traffic in NH48 under CWSS to Vellore Corporation, 11 Municipalities, 5 Town Panchayats and 944 wayside rural habitations in Vellore district - Package III 09/ F.Tender Notice/ DB /2023/ Dated:20.11.2023 Status
19 05/12/2023 - 17:40 05/12/2023 - 17:30 Shifting of Pipelines laid along Nanthiyalam KM 134/000 in Vellore District due to road widening of NH48 in Vellore District under Vellore CWSS. 09/ F.Tender Notice/ DB /2023/ Dated:20.11.2023 Status
20 05/12/2023 - 17:45 05/12/2023 - 17:30 1.Shifting of Pipelines due to road widening of NH48 at Vengili-JN KM 80/580 and Vettuvanam – JN KM 94/950 in Vellore District under Vellore CWSS. 2.Shifting of Pipelines laid along Nanthiyalam KM 134/000 in Vellore District due to road widening of NH48 in Vellore District under Vellore CWSS 3.Shifting of Pipelines at Kandaneri – JN KM 100/893 and Vallandaram – JN KM 104/800 in Vellore District due to road widening of NH48 in Vellore District under Vellore CWSS. 4.Shifting of Pipeline which are affected due to road widening in NH48 at Arapakkam 129/150KM and VC Mottur to Vannevidu near Walajah Government Hospital in NH4 in Vellore District under Vellore CWSS. 09/F.Tender Notice/DB/2023 Dated:20.11.2023 Status

Pages