S.No | Last Date/Time of Submission | Last Date/Time of Sales/Download of Documents | Name Of Work | Tender Notice | Tender Status |
---|---|---|---|---|---|
1221 | 18/03/2020 - 15:00 | 16/03/2020 - 17:45 | Providing WSIS to Thiruthani Municipality in Thiruvallur District with river Palar as source at Athippattu Head works – Construction of Infiltration wells – 4.50m dia - 11 Nos and allied works at Head works . Execution period – 9 months. Trial run 6 months and paid maintenance of the scheme – 12 months | IFB NO. 26/WSIS to Thiruthani Municipality/DO/CE/VLR/2019/Dated:10.02.2020 | Status |
1222 | 17/02/2020 - 15:00 | 14/02/2020 - 17:45 | Providing SCADA arrangements on D.B.O basis with latest technology for CWSS to Cuddalore Municipality, Bhuvanagiri & Parangipettai Town Panchayats and 812 Rural Habitations in Cuddalore District Phase - I including maintenance for a Period of one year at free of cost and further 4 years on paid maintenance. (Period of completion : 6 months) (2nd call) | IFB No.22 /F.SCADA – Cudd. CWSS/ DO/CW/VLR/2020/ Dt:13 .01.2020(2nd call) | Status |
1223 | 21/02/2020 - 15:00 | 19/02/2020 - 17:45 | CWSS to Tambaram – Pallavaram in Chengalpattu District – Construction of pipe carrying bridge in the LS 2619m to LS 2769 m for the length of 150m in Package IV in shifting the 600mm AC gravity main with 600mm DI S/S pipe from Mannivakkam Junction to Keelpadapai – Period of completion 3 months. | IFB NO. 01 /DO / DB /KTC/ ALR / 2020 /Dated:03.02-2020 | Status |
1224 | 11/02/2020 - 15:00 | 10/02/2020 - 17:45 | Providing water supply scheme to Peru Nagar Habitation in Peru Nagar panchayat in Uthiramerur union in Kancheepuram District. Construction of 20000 Litres OHT and allied works. | Tender Notice No.21 | Status |
1225 | 11/02/2020 - 15:00 | 10/02/2020 - 17:45 | Providing water supply scheme to Grace Nagar and Indira Nagar Habitation in Orathur panchayat in Kundrathur union in Kancheepuram District. Construction of 40000 Litrs OHT, Pump Room, Supply and erection of Pumpset ,Pumping main ,Distribution system and allied works etc.complete | Tender Notice No.21 | Status |
1226 | 21/02/2020 - 15:00 | 19/02/2020 - 17:45 | CWSS to Tambaram – Pallavaram in Chengalpattu District – Construction of pipe carrying bridge in the LS 2619m to LS 2769 m for the length of 150m in Package IV in shifting the 600mm AC gravity main with 600mm DI S/S pipe from Mannivakkam Junction to Keelpadapai – Period of completion 3 months | IFB NO. 01 /DO / DB /KTC/ ALR / 2020 /Dated:03.02-2020 | Status |
1227 | 05/03/2020 - 03:00 | 03/03/2020 - 05:45 | Providing Dedicated Water Supply Scheme to Bodinaickanur Municipality in Theni Districtwith river MullaiPeriyar as source including maintenance for a period of 12 months (Period of completion – 12 months) | F.Bodi DWSS /SDO I/ CW /2020 /Dt.27.01.2020 | Status |
1228 | 04/03/2020 - 15:00 | 02/03/2020 - 17:45 | Setting up of Water Distribution Station (WDS) to Cater the needs of IT Components and neighborhoods areas of Urapakkam in Chengalpattu District under MNP Fund - Execution period – 9 months, Trial run period – 6 months and maintenance of the scheme – 12 months. | IFB No 25/F Urapakkam / DOI / CE / VLR / 2020 / Dated 28.01.2020 | Status |
1229 | 27/02/2020 - 15:00 | 25/02/2020 - 17:45 | Operation and Maintenance of Hogenakkal Water supply and Fluorosis Miitgation Project in Dharmapuri and Krishnagiri Districts for a period of 48 months From 01.04.2020 to 31.03.2024 3rd call Package V | 23/Hog Pkg I to V /3rd call/ DO/CE/ VLR/ 2020/ Dt 23.01.2020. | Status |
1230 | 27/02/2020 - 15:00 | 25/02/2020 - 17:45 | Operation and Maintenance of Hogenakkal Water supply and Fluorosis Miitgation Project in Dharmapuri and Krishnagiri Districts for a period of 48 months From 01.04.2020 to 31.03.2024 3rd call Package IV | 23/Hog Pkg I to V /3rd call/ DO/CE/ VLR/ 2020/ Dt 23.01.2020. | Status |
1231 | 27/02/2020 - 15:00 | 25/02/2020 - 17:45 | Operation and Maintenance of Hogenakkal Water supply and Fluorosis Miitgation Project in Dharmapuri and Krishnagiri Districts for a period of 48 months From 01.04.2020 to 31.03.2024 3rd call Package III | 23/Hog Pkg I to V /3rd call/ DO/CE/ VLR/ 2020/ Dt 23.01.2020. | Status |
1232 | 27/02/2020 - 15:00 | 25/02/2020 - 17:45 | Operation and Maintenance of Hogenakkal Water supply and Fluorosis Miitgation Project in Dharmapuri and Krishnagiri Districts for a period of 48 months From 01.04.2020 to 31.03.2024 3rd call Package II | 23/Hog Pkg I to V /3rd call/ DO/CE/ VLR/ 2020/ Dt 23.01.2020. | Status |
1233 | 27/02/2020 - 15:00 | 25/02/2020 - 17:45 | Operation and Maintenance of Hogenakkal Water supply and Fluorosis Mitigation Project in Dharmapuri and Krishnagiri Districts for a period of 48 months From 01.04.2020 to 31.03.2024 3rd call - Package I | 23/Hog Pkg I to V /3rd call/ DO/CE/ VLR/ 2020/ Dt 23.01.2020. | Status |
1234 | 06/02/2020 - 15:00 | 04/02/2020 - 17:45 | Providing 070MLD of water supply to Tamilnadu Slum Clearance Board HFA at Narimadu in Pudukkottai District from Mullur vilaku Booster Sump of CWSS to 1751 habitations in Pudukkottai District under deposit work including paid maintenance for one year Period of completion 6 months | 07 F WSS to TNSCB 2019 SDO dt 21 01 2020 II CALL | Status |
1235 | 20/02/2020 - 15:00 | 18/02/2020 - 17:45 | CWSS to Aruppukottai, Sattur and Virudhunagar Municipalities in Virudhunagar District with River Tamirabarani as source including maintenance for a period of 12 months. (Period of completion– 18 months)CW Pumping Main from Vannimadai Booster to Sattur Municipality, Sennelkudi Booster to Aruppukottai and Virudhunagar Municipalities, Infrastructures to above Municipalities, and SCADA Arrangements for Entire Project - Package – III | . Aruppukottai CWSS /DO II / CW /2019 /Dt.06.01.2020 | Status |
1236 | 20/02/2020 - 15:00 | 18/02/2020 - 17:45 | CWSS to Aruppukottai, Sattur and Virudhunagar Municipalities in Virudhunagar District with River Tamirabarani as source including maintenance for a period of 12 months. (Period of completion– 18 months) Booster Stations at Vannimadai – II & Sennelkudi -III, CW Pumping Main from Sillankulam Booster Station to Vannimadai and Vannimadai Booster to Sennelkudi Booster -Package – II | Aruppukottai CWSS /DO II / CW /2019 /Dt.06.01.2020 | Status |
1237 | 20/02/2020 - 15:00 | 18/02/2020 - 17:45 | CWSS to Aruppukottai, Sattur and Virudhunagar Municipalities in Virudhunagar District with River Tamirabarani as source including maintenance for a period of 12 months. (Period of completion– 18 months) Head Works, WTP, RW Pumping Main, CW Pumping Main from WTP to Sillankulam Booster, Sillankulam Booster Station -I – Package – I | Aruppukottai CWSS /DO II / CW /2019 /Dt.06.01.2020 | Status |
1238 | 24/01/2020 - 15:00 | 23/01/2020 - 17:45 | Providing WSS to Elanagar Colony in Elanagar Panchayat of Uthiramerur union. Construction of pump room , pumpset and pipe line works | 20 | Status |
1239 | 12/02/2020 - 15:00 | 10/02/2020 - 17:45 | Revival of outlived CWSS to Sankarankoil Municipality, Alangulam Town Panchayat and 88 wayside habitations in Tirunelveli District (Period of completion– 12 months) | Outlived Sankarankoil /SDO II/ CW /2019 /Dt.06.01.2020 | Status |
1240 | 21/02/2020 - 15:00 | 19/02/2020 - 17:45 | Water Supply to Advanced Institute for Integrated Research on Livestock and Animal sciences at Thalaivasal Koot Road in Salem District Package 3 | 10 F WS to Livestock in Salem 3 DO T5 CE CBE 2020 Dt 20 1 20 | Status |
Saturday, 12 April 2025