Providing CWSS to 759 Habitations in Tirupathur, Jolarpet, Kandhili, and Natrampalli Union of Tirupathur District
CWSS to 759 Habitations in Tirupathur, Jolarpet, Kandhili, and Natrampalli Union of Tirupattur District was administratively sanctioned for Rs.182.09 crore vide G.O.(Ms) No.201/dated.30.11.2020. The scheme is to be implemented under JJM fund.
The Intermediate (2037) and Ultimate (2052) population for this scheme is 215063 and 2406161 respectively. By adopting pro-rata supply of 55 LPCD the intermediate and ultimate requirements of water for the scheme is 10.54 MLD and 11.55 MLD respectively.
Package I
The source for this CWSS is tapping from existing Vellore. CWSS Gravity main in Tirupathur Municipality Puthupet Road. The clear water is proposed to be conveyed by Branch Gravity main to Common sump of 29.30LL at Kathirimangalam and then pumped to Group sumps @ Ammankoil, Pallathur and Bhandarapalli. From common sump & Group sumps water is pumped to 40 Nos of Panchayat sumps through a Pumping main of length of 549.268 km. From Pumping main it is proposed to supply water to existing and newly constructed 39nos of new OHT’s.
Package II
The source for this CWSS is tapping from existing Vellore. CWSS Gravity main near Periyakambiyampattu, Reddiyur Koot road. The clear water is proposed to be conveyed by Branch Gravity main to Group sump of 6.15LL at Periyakamiyampattu and then pumped to Panchayat sumps @ Ammaiyappa nagar, Athurkuppam, Periyakammiyambattu, Kethandapatti, Koothandakuppam, Pethakallupalli, Nekkunthi, Chinnamottur, Periyamottur, Athurkuppam . From Group sump water is pumped to 10 Nos of Panchayat sumps through a Pumping main of length of 115.02km. From Pumping main it is proposed to supply water to existing and newly constructed 8nos of new OHT’s.
Work order for this scheme was issued on 25.02.2021 and works are in progress. The scheme is targeted for completion by 07/2023 and put into beneficial use.
Name of Scheme | Providing CWSS to 759 Habitations in Tirupathur, Jolarpet, Kandhili and Natrampalli Union of Tirupathur District from the Industrial demand provision of Vellore CWSS under JJM Package 1 & 2 |
---|---|
Administrative Sanction: | G.O Ms. No: 201/RD&PR/(CGS-1)Dept/Dt 30.11.2020 Rs.182.09 Crore |
Value | Rs.182.09 Crore |
Fund | JJM – Rs.82.09Crore SMS – Rs.82.09Crore Other – Rs.3.78Crore Centage – Rs.14.13Crore |
Technical Sanction | CE/TWAD/Vellore No.97/2020-21/dt.03.12.2020/Rs.144.213Crore |
Work Order date | 25.02.2021 |
Date Commencement | 25.02.2021 |
Contractor Name | 1.Package 1 – M/s. Keyem Infra Project Pvt Ltd., Chennai-41 2.Package 1 – M/s.Raja & Co, Mettur |
Present LPCD | 15 Litre |
After scheme Implementation | 55 Litre |
Design Quantity | ரூ. 10.58 கோடி |
Package 1 Initial year (2022) : 9.29MLD Intermediate Year (2037) : 10.54MLD Ultimate Year (2052) : 11.55MLD Package 2 Initial year (2022) : 1.95MLD Intermediate Year (2037) : 2.22MLD Ultimate Year (2052) : 2.44MLD | ரூ.19.41 |
Beneficiaries | 759 Habitations |
Information | Beneficial System Quantity of water supply after scheme implementation 759 Rural habitations Design Quantity (MLD) Supply Quantity (MLD) Union Panchayat 4nos - Jolarpet Union (25) 8.27 - Kandhili Uinon (12) 2.69 - Tirupathur Union (4) 0.71 - Natrampalli Unoin (09) 2.32 - Total 13.99 - |
Head Works | Package 1 From Vellore CWSS Gravity main in Tirupathur Municipality Puthupet Road Tapping taken. Package 2 From Vellore CWSS Gravity main near Periyakambiyampattu, Reddiyur Kootroad Tapping taken. |
Source | - |
Sump | Package 1 – 40 Nos Package 2 – 10 Nos |
Pumping Station | Package 1 – 4 Nos Package 2 – 1 Nos |
Over Head Tank | Package 1 – 39 Nos Package 2 – 08 Nos |
Pumping main | Pumping main and Feeder Main Package 1 – 549.268Km Package 2 – 115.02Km |
Year Maintenance Cost | Rs.4.00Crore |
Cost per 1000 Litre | Rs.18.77 |
Cost per capita | Rs.17084 |